Concrete-Pumping-The-Mark.jpg

The Conco Companies is providing concrete services for The Mark, a new 48-story high-rise tower in Seattle that will consist of 528,000 sq. ft. of Class A+ office space as well as a SLS hotel and spa. Conveniently located in the city’s central business district, the tower will incorporate a wide range of “green” building features. Scheduled for completion in April, 2017, the tower will bring to the area first-class office space that is highly divisible and offers spectacular views. The unique geometric facade provides exterior seismic bracing for structural safety as well as offering column-free floor plates. The Mark is seeking LEED Gold certification.

The 5,000 cubic yard mat foundation pour was completed in June, 2015 and required approximately 500 truckloads of concrete over the course of the day. The project also includes a sub-level parking structure comprised of shotcrete perimeter walls and a concrete elevator core. As of May 2016, Levels 5-11 decks have been poured and the core poured to Level 35. When the elevator core reaches Level 35, the remainder of the building steel will be erected in one continuous phase. The Mark has 9 floors below grade and 44 floors plus the roof above grade.

Read more about the project here.


Indio-Detention-Center-Conco-Commercial-Concrete.jpg

The Conco Companies are providing the structural concrete services for Riverside County’s East County Detention Center (ECDC) located in Indio, California. The 516,000 sq. ft. project is a replacement and expansion to the existing Indio Jail Facility and is being constructed in two phases. The project consists of a three-story support building with a connecting tunnel to a four-story structure containing two housing units and mezzanine levels.

Conco’s responsibilities include supplying and performing services totaling 55,000 cubic yards of concrete. The four-level housing units are stacked in two separate “pods” and will be constructed of cast-in-place concrete as will the support building. We are also utilizing our pumps to pour piles 60’ below ground-level for Becho, another trade partner. Final completion of the project is expected in December, 2017.

One of the project’s unique challenges is that the temperatures in Indio average 89°F and summer highs can reach 120°F. Crew safety becomes even more critical in this environment.   We will have a full-time safety manager on site and the 100+ Conco employees and Conco subcontracted employees are adhering to ACI’s Hot Weather Concreting procedures.

Read more here:

East County Detention Center Topping Out

The East County Detention Center Project

 


Conco-Companies-CPMCSutter-Van-Ness-Medical-Office-Building.jpg

Location:   San Francisco, CA
Developed by: Pacific Medical Buildings
Architect: Boulder Associates
Design/Build General Contractors: Charles Pankow Builders, Ltd. & The Conco Companies
Cost: $168M

The Conco Companies, along with Charles Pankow Builders, Ltd. were awarded the contract for the Van Ness Medical Office Building under development by the Pacific Medical Buildings. Located on the rebuilt California Pacific Medical Center (CPMC) Cathedral Hill campus, the 250,000 square-foot project will consist of nine stories above grade, street level retail and six levels of below-grade parking. The project is expected to be completed in late 2018 and is on track to receive LEED Silver certification.

Using a Lean Construction delivery process, Conco, in conjunction with Pankow is utilizing 3-D BIM (Building Information Modeling) programs to improve efficiency by coordinating all design disciplines and minimizing constructability issues. Design elements include four green roof gardens that will provide 25,000 square feet of green space.

Read more about the project here.



The Conco Reinforcing $4,500,000 Sacramento Water Treatment Plant Project in Downtown Sacramento, CA with Overaa Construction Company started in July 2014 and will be completed in March 2016. The City of Sacramento WTP Improvements included Filter Lagoons, Gravity Thickeners, Sludge Pump Stations, Dewatering Building, Sedimentation Basins, Filtration Complex, High Service Pumps Stations along with many other miscellaneous structures.

Website: http://www.overaa.com/projects/sacramento-water-treatment-plants

 


Conco Locations West Coast

DIRECT LINES

The Conco Companies

Conco Headquarters

(800) 695-6799

Pumping

(800) 347-3407

Confoam™

(866) 347-3407


EMAIL

Send A Message

Use our online form to send us a secure message.

CONTACT US

GET IN TOUCH

Follow Our Activity

See how Conco is transforming communities with technology and innovation while delivering premium concrete services.


Northern California


(925) 685-6799

5141 Commercial Circle

Concord, CA 94520

Southern California


(909) 350-0474

13052 Dahlia Street

Fontana, CA 92337

Oregon/SW Washington


(971) 808-5954

7025 N Leadbetter Road

Portland, OR 97203

Washington


(425) 251-1684

18644 72nd Avenue S

Kent, WA 98032